Wednesday, 11 April 2012

Industry Placement; Day Ten

11th April 2012

After the long Easter weekend (plus another day due to injury) there wasn't much for me to do in the office so Richard sent me downstairs to the workshops to work alongside Richie, one of the Project Carpenters. Before I went down I found the acetate CNC job I did the week previous, although it's upside-down it looks cool!


My first job with Richie was to paint inside the lightboxes - within five minutes I had dunked my fringe in the bucket. 

These are the lightboxes inside the set; the dibond strip is to attach the led onto.

These is the set for the EPT; the lighting truss and the other truss (on the floor)

LED screens starting to go in

Lifting the truss to attach to the lighting truss. 

Measuring to make sure the truss is level all the way round. 
I had a fun day working alongside the boys; I preferred it to the office as there was a little more "banter" to be had! It was a less stressful environment and I got along with everyone as there is more opportunity to have a conversation. 


No comments:

Post a Comment