5th April 2012
Site Visit
Richard decided to take me on site with him to do a recce; survey the area, double check measurements against the ground plan and liaise with other Project Managers. It was a conference for a computer programming company, so design wise it wasn't that exciting.
After using a laser to measure the main hall of the function room, we then had to analyse this side area and see if it correlates with the design.
As you can see from the below image there is a fire hose that needs permanent access, so the flat that is going in front of that needs to have access.
This is the area that the stand needs to go into, but upon measuring we realised that the design is oversize by a metre in all dimensions, so this needs to go back to the designer for reworking. There was also no consideration in place for the pillars.
It was good going on site with Richard, as I have fully seen the process of production with this sort of commercial set design and I can also see the space in real life as opposed to just on a ground plan.
No comments:
Post a Comment