Monday, 13 February 2012

Meeting with Richard McCabe

13th February 2012
The Model Box of the Set

Rebecca organised a meeting between myself, Richard, Laura and John to make sure everything was going in the right direction, and he could cast his professional opinion over everything. 

Richard and I met independently first, and we started by looking at the model box and compiling a list of stupid questions. Things like, 

- What are the scaff legs made of?
- How are they being fixed to the floor?

And from here we could start to build up a hardware list and everything else. 

Scaff legs were to be made of 48.8 ali scaff tube which is cheap and easy to get hold of - ask for the oldest, mankiest stuff to match the set design. To be attached to the floor using angled kee klamps. 

Hardware List
- 8 angled kee klamps
- 40 scaff clips (swivel) - to stop bars moving
- hex sets/nuts/washers / m10 x 50mm
- hex sets/nuts/washers / m8 x 60mm
- countersunk medium screw with nuts and washers

Timber
(use creffields)
7 sheets  10 x 5 4mm ply Class 1    (£25ps)
3 sheets  10 x 4 12mm ply               (£38.06ps)
3 sheets  10 x 4  18mm MDF           (£38.00ps)
100m 3 x 1                                      (£0.75pm)
100m 2 x 1                                      (£0.39pm)

Total; £520 + VAT inc. delivery

Richard and I then went through how we were going to build it, which I transferred into my technical drawings (the final ones you can see in my submission folder). 

I'm looking forward to this build and feeling much better now that I have been through it with Richard. 