23rd February 2012
It's not long now till we start building - and there are still several things we need to clear up.
At the moment it looks like we are using the tower we have downstairs and just adding pieces from A1 - however this is likely to change as it always does! I've asked John to ring A1 Scaffolding and get another quote. - Platform at 2m and handrail at 3m.
We also need to put some hooks on the scaff tower for the fish shop sign.
Pete's main concerns were regarding the pinspot lights that shine through the road pieces and how we are going to hold them there. We settled on a "goal post" for the lights to hang from at 300mm behind the road face. For this we'll use angled Dexion and 3x1 either side of the aperture.